Email us
BIOPHARMA APPLICATIONS

Gene therapy · AAV and lentiviral vectors

What must be confirmed before changing a supplied component?

Single-use bag in a support vessel
Single-use bag in a support vesselIllustrative installation. The illustration does not establish suitability for a product or process.

Read the solution guide

All applications

Process context

An apparent match in grade or contact boundary is only a starting point. Define the specifications, evidence and traceability needed by Process Development and Quality.

Where filtration is reviewed

At the filtration point designated by the approved process, compare equipment interfaces, wetted materials and change notification.

Role of single-use bags

Check ports, external support, traceability and assembly integrity evidence for the existing hold or transfer duty.

What to share with us

Application scope · equipment interface · quality documents and change notification · sample assessment needs

Editorial references

Document component evidence for development-to-production handover

The problem on site
A list of part names from development may be insufficient to trace materials or judge change impact when production prepares to buy.
Proposed solution
Compare approved and proposed configurations using drawings, material traceability and documentation availability, then route only true differences for change review.
What to verify before selection
Confirm development, production and quality responsibilities, document version and timing. Do not assume performance evidence transfers to another configuration.