Email us
Home/Biopharmaceutical Processes/Integrity & Qualification
Biopharma · APPLICATION GUIDE

Integrity & Qualification

Prepare reliable test conditions together with the information needed for change control.

Review selection pointsDiscuss this application
APPLICATION IN CONTEXT

Industrial application examples

See where equipment is used in the process.

APPLICATION IN CONTEXT
A filter test station links to comparative evidence and quality review. Alternative-product assessment follows the approved change-control process. 1. Test gas; 2. Automated tester; 3. Filter/assembly; 4. Test record; 5. Evidence/change review
A filter test station links to comparative evidence and quality review. Alternative-product assessment follows the approved change-control process.
  1. Test gas
  2. Automated tester
  3. Filter/assembly
  4. Test record
  5. Evidence/change review

Connections to review

  • 01 → 02 Test gas → Automated tester
  • 02 → 03 Automated tester → Filter/assembly
  • 02 → 04 Automated tester → Test record
  • 04 → 05 Test record → Evidence/change review

Investigate failures under approved procedures. Alternative products require evidence, performance and change-control review.

A conceptual illustration created to explain equipment and application locations. It is not an actual product photograph, installation photograph or piping/wiring design.

Read the solution guide

01 — PROCESS

Where does each step fit?

Define the intended use and conditions to identify the required role of each item.

01

Review current criteria

Check the test method, limits, test fluid and temperature, and filter configuration.

02

Analyze causes and data differences

Distinguish equipment leaks, wetting, and settings from differences in supplier documentation.

03

Quality assessment and change control

Reach a conclusion through established investigation and retest procedures and approved comparative testing.

02 — SELECTION

What should be selected and verified?

An integrity test failure does not necessarily mean the membrane is damaged. Investigate wetting, test fluid, temperature, system leaks, and test settings. Compare alternatives based on materials, validation, and process performance as well as dimensions.

Scroll horizontally to review all columns.

Process objectiveStep to reviewSelection evidence
Hydrophilic membranes for liquidsBubble point / diffusionComplete wetting, test fluid surface tension, area, and limits
Hydrophobic membranesSuitable methods such as WITManufacturer-validated method, temperature, stabilization, and configuration
Test failuresRoot-cause investigationLeaks, valve positions, residual liquid, settings, and history
Alternative filtersDocumentation and performance comparisonRetention, integrity, E&L, compatibility, yield, and notification of supply changes

Compare actual operating conditions with supplier evidence and confirm the required performance and validation scope.

03 — OPERATING CHECKS

Use operating data to identify improvements.

Do not repeat testing until a pass is obtained

Follow approved failure investigation and retest procedures, retaining the initial result and the history of actions taken.

Do not directly apply water-based criteria to product fluid

Surface tension and wetting characteristics may differ. Confirm the correlation for testing with product fluid.

Create a documentation list for each item

Compare test certificates, materials, traceability, sterilization, retention performance, and the supplier’s change control practices.

04 — QUESTIONS

Frequently asked questions

Does passing an integrity test guarantee batch sterility?

It is an important check of the condition of the filter concerned, but it does not replace the overall aseptic process or batch quality assessment.

Can a replacement be made immediately if the material and pore size match the current product?

Process performance and validation data may differ. Comparison against predefined acceptance criteria and change control are required.

A replacement dossier is not evidence of equivalence on its own

The problem on site
Candidates with a similar drawing and nominal grade can differ in material, geometry, connection tolerances and test evidence. If responsibilities are not separated, key support for change approval can be missing.
Proposed solution
Compare incumbent and replacement documentation, interfaces and test evidence line by line. Separate documentary checks, checks requiring a representative assembly and decisions that belong in customer quality change control.
What to verify before selection
Verify the scope of manufacturer evidence, traceable records, approved test reports and the customer's change procedure. The review does not certify equivalence or approve a change.
05 — APPLICATION REVIEW

Prepare the conditions for a technical discussion.

These details help narrow the configuration and the evidence to review.

Prepare an enquiry
MANUFACTURER PRODUCTS

Compare equipment types by application.

Confirm model suitability and supply scope through a technical review. Use each card to make an enquiry or review official manufacturer information.

PES membrane cartridge filter
Process filtration

PES membrane cartridge filter

A hydrophilic PES 0.2 μm membrane cartridge described for sterilizing filtration of pharmaceutical liquids. Verify compatibility, microbial retention and integrity-test conditions for the actual process.

Enquire about this product
Conceptual pressure-hold test principle; not the appearance of an actual manufacturer product.Conceptual schematic · not an actual product photo

An original schematic of the pressure-hold test principle. It does not show the manufacturer’s actual equipment, supplied configuration or test procedure. Confirm food-and-beverage filter/test conditions; pharmaceutical suitability and qualification require separate validation evidence.

Process filtration

Pressure-hold integrity testing equipment

The manufacturer presents this configuration for pressure-hold testing of sterilizing membrane filters in food and beverage production. Confirm the filter and test conditions against item-specific documentation.

Enquire about this product

Product photographs and manufacturer images use permitted official materials and source links. Original explanatory schematics are identified separately from actual product photographs.

Review what changes when replacing a product.

Compare connection, operating and documentation requirements against the current product code and reason for replacement. Separate verified matches from items needing more evidence or evaluation. Nominal volume or pore size alone does not establish equivalence.

Request a replacement review

Full buyer review guide

Review your filtration requirements

Selection, replacement or quantity and lead-time review. Start with the information you have.

Review a replacement

Material, connection and sterilization requirements

Select for a new process

Application conditions and required documents

Request quantity & lead-time pricing

Known quantity, accessories and timing