Contact

Land-based PV plant

Track how conditions differ across the site

For a ground-mounted PV plant, review representative irradiance and module temperature sensor positions across areas with different orientations, shade and soiling. Plan maintenance records that can be compared with output.

Illustrative plant scene

Solar PV overview

Review sequence

  1. Start with matched zones, not a site average

    Group arrays with comparable orientation, tilt and modules. Record local influences such as road dust or terrain shading independently. In bifacial plants, horizontal albedo and rear-plane irradiance are distinct measurements.

  2. Do not label every yield drop as soiling

    Check sensor position, sensor contamination, missing records, inverter clipping or limits, grid curtailment and AC metering at the same time. Then compare equivalent DC strings, irradiance and module temperature, and narrow targeted I–V checks to the suspect sections.

  3. Verify cleaning with a comparison zone

    MARS supplies a point optical soiling indicator, not a direct measure of plant-wide lost kilowatt-hours. Compare a cleaned zone and an uncleaned reference at matching times. Review module cleaning requirements, access and transition gaps.

Land-based PV: narrow the cause before cleaning

Once an underperforming section is found, agree on the order of checks and the records needed before spending on remediation.

  1. Rule out output limits before calling it soiling

    Operations first checks inverter limits, curtailment records, sensor timestamps and condition. Compare similarly configured DC strings over the same window. Record which periods show power limitation and which sections warrant a field check.

  2. Compare selected modules in equivalent conditions

    The monitoring engineer selects modules of the same type and mounting in the suspect and reference areas, then records I–V curves, irradiance, actual module temperature and timestamps together. Note which differences are explained by conditions and which warrant investigation.

  3. Use a pilot to set the cleaning decision threshold

    Operations and procurement designate a small pilot and a comparison area. Compare before and after with matched time and irradiance conditions. Weigh the plausible recovery value against labor, equipment and access costs to choose the cleaning scope.

Equipment

Solar panel cleaning robot selection guide

Measurement standards and engineering references

Engineering background: comparison with irradiance and module temperature (Sean White), separate energy-loss categories (Haque et al.), and the distinction between performance ratio and fault diagnosis (Manimegalai et al.). Public technical references follow.

Tell us about your site

Share the information below so we can review what you need to measure and which equipment could suit the site.

  • Plant type and location, and whether it is planned or operating
  • Layout, module orientation and tilt, and whether the modules are bifacial
  • Current measurement points, logged data, power and communications
  • Inspection and cleaning access, and the issue you want to address
Enquire about PV monitoring and operations

These are examples for project review. Equipment suitability and supply scope depend on the site and requested configuration.